Project deliverables
FaStGO final report - in English
Download
FaStGO final report - in French
Download
Task 1: Mapping of currently existing standardisation frameworks - Task 1.1 Comparison between EN16325 and EECS
Download
Task 1: Mapping of currently existing standardisation frameworks - Task 1.2 Comparison of EN16325 and EECS Rules with (EU) 2018-2001 on GOs
Download
Task 1: Mapping of currently existing standardisation frameworks - Task 1.3 Mapping GO system management challenges v2
Download
Task 1: Mapping of currently existing standardisation frameworks - Task 1.3 Mapping GO system management challenges - Annex 1 Consultation
Download
Task 2: Part1 - Explanatory notes to text proposals for revised EN16325_FaStGO consultation
Download
Task 2: Part 2 - Update FASTGO proposal EN 16325 revision carrier specific 20200708 after consultation
Download
Task 2: Part 3 - Takeways from consultation of text proposals for a revised EN16325
Download
Task 2: Part 4 - Consultation responses and FaStGO reaction
Download
Task 3.1: Develop a Vision for the future IT Infrastructure
Download
Task 3.2: Data protocol for multi-energy-purpose GO
Download
Task 3.3: High level requirements specification
Download
Task 4.1: Statistics Design Specifications
Download
Task 4.2: Update of the residual mix calculation method
Download